Logo of the Physikalisch-Technische Bundesanstalt

Search

Search result

457 results:
  • 131. 2012 Nemitz Metrologia49 Trajectory characterization revtex author version  
    Date: 04.06.2012
    Percental score: 2 %
    2012 Nemitz Metrologia49 Trajectory characterization revtex author version Atomic trajectory characterization in a fountain clock based on the spectrum of a hyperfine transition N. Nemitz,∗ V.  
  • 132. PTB Q5 GATT EN  
    Date: 27.02.2013
    Percental score: 2 %
    PTB Q5 GATT EN MAIN FEATURES OF WORLD TRADE LAW With special focus on the TBT Agreement A guideline Dr. Alexander Djazayeri Physikalisch Technische Bundesanstalt Braunschweig und  
  • 133. 2012 Bauch Metrologia 49 - UTC PTB author version  
    Date: 19.06.2012
    Percental score: 2 %
    2012 Bauch Metrologia 49 - UTC PTB author version Generation of UTC(PTB) as a fountain-clock based time scale A. Bauch, S. Weyers, D. Piester, E. Staliuniene, W. Yang* Physikalisch-Technische  
  • 134. Igsm MU lecture2 Hueser  
    Date: 14.08.2023
    Percental score: 2 %
    Igsm MU lecture2 Hueser Illustration of three different approaches to estimate measurement uncertainties Dr. habil. Dorothee Hüser, PTB dorothee.hueser@ptb.de,  
  • 135. qmh-5 kap3 1  
    Date: 24.04.2009
    Percental score: 2 %
    Kap. 3.4 qmh-5 kap3 1 Qualitätsmanagement-Handbuch Abteilung 5 3 Leistungsangebot 3.1 Kalibrierungen und Prüfungen In the CMCs uncertainty statements, the notation Q[a, b] stands for the  
  • 136. ra45 98 03-en  
    Date: 07.03.2011
    Percental score: 2 %
    ra45 98 03-en Physikalisch-Technische Bundesanstalt Radioaktivität PTB-Ra-45 Braunschweig, November 2005 Herbert Wershofen and Dirk Arnold Radionuclides in Ground-level Air in Braunschweig  
  • 137. Igsm MU lecture1 Hueser  
    Date: 16.08.2023
    Percental score: 2 %
    Igsm MU lecture1 Hueser Review on methods to estimate measurement uncertainties The various concepts of the “GUM” and its supplements Dr. habil. Dorothee Hüser, PTB dorothee.hueser@ptb.de,  
  • 138. ptb23 2e  
    Date: 27.06.2014
    Percental score: 2 %
    ptb23 2e These PTB Requirements are originally written in German. In case of any conflict between the German language version and the English translation of it, the German version shall  
  • 139. ringvergleich HFSpannung draft b  
    Date: 21.02.2012
    Percental score: 2 %
    ringvergleich HFSpannung draft b Nationaler Ringvergleich HF-Spannung 2008/2009 Draft B-Report Stand: 22.06.2010 Physikalisch- Technische Bundesanstalt, Arbeitsgruppe 2.22 Bundesallee 100, 38116  
  • 140. Ringvergleich HF-Spannung Draft B  
    Date: 30.09.2010
    Percental score: 2 %
    Ringvergleich HF-Spannung Draft B Nationaler Ringvergleich HF-Spannung 2008/2009 Draft B-Report Stand: 22.06.2010 Physikalisch- Technische Bundesanstalt, Arbeitsgruppe 2.22 Bundesallee 100, 38116  
###SPINNER###
Search results 131 until 140 of 457
The search query was processed in 264 ms.

Search behavior

In the search, the following parameters can be used:

  • "": Phrase search. The words you entered must occur exactly as entered in the search results. Example: "Metrological Services"
  • -: NOT operation. A word can not appear in the search results. Example: "Metrological Services" -"Verification Act"
  • *: Substring search. Example: "Metrological Services" measure* finds "Metrological Services" measures and "Metrological Services" measurement

If you enter more than one search term, the individual words are connected with an "AND".