Logo of the Physikalisch-Technische Bundesanstalt

Search

Search result

481 results:
  • 101. Zulassungsliste  
    Date: 03.04.2020
    Percental score: 2 %
    Zulassungsliste Zulassungsnr. § - BeschG Zulassungsinhaber Bezeichnung Kaliber Typ 1-69 7 Karl-Heinz Kerner Apparatebau Mod. 287 9 x 17 Viehschussgerät 1-69 7 Jopp GmbH Mod. 287 9 x  
  • 102. PTB Q5 Accreditation EN  
    Date: 21.02.2013
    Percental score: 2 %
    PTB Q5 Accreditation EN THE ROADMAP TO AN ACCREDITATION SYSTEM 30 Milestones for Developing Countries Accreditation bodies The global market allows goods to be exchanged between countries and at  
  • 103. Study Quality of PV Plants in India  
    Date: 04.03.2021
    Percental score: 2 %
    Study Quality of PV Plants in India INTERNATIONAL COOPERATION Pilot Study on Quality Aspects of PV Power Plants in India Conducted in the framework of the Indo-German cooperation  
  • 104. 2002 Bauch Weyers - Phys.Rev.D65 LPI New experimental limit on the validity of local position invariance  
    Date: 26.02.2010
    Percental score: 2 %
    2002 Bauch Weyers - Phys.Rev.D65 LPI New experimental limit on the validity of local position invariance RAPID COMMUNICATIONS PHYSICAL REVIEW D, VOLUME 65, 081101共R兲 New experimental limit on the  
  • 105. SCC RefArc4MeasInstLegControl  
    Date: 30.05.2018
    Percental score: 2 %
    SCC RefArc4MeasInstLegControl Received: 31 January 2018 Accepted: 7 March 2018 DOI: 10.1002/spy2.18 SPECIAL ISSUE ARTICLE Secure Cloud Computing: Reference Architecture for Measuring Instrument  
  • 106. PTB Q5 GATT DE  
    Date: 15.02.2013
    Percental score: 2 %
    PTB Q5 GATT DE GRUNDZÜGE DES WELTHANDELSRECHTS Unter besonderer Berücksichtigung des TBT-Übereinkommens Eine Handreichung Dr. Alexander Djazayeri Physikalisch Technische Bundesanstalt Braunschweig  
  • 107. 2018 Weyers Metrologia Advances in the accuracy stability and reliability of the PTB primary fountain clocks  
    Date: 28.10.2019
    Percental score: 2 %
    2018 Weyers Metrologia Advances in the accuracy stability and reliability of the PTB primary fountain clocks Advances in the accuracy, stability, and reliability of the PTB primary fountain clocks S  
  • 108. Figures and Facts  
    Date: 31.03.2016
    Percental score: 2 %
    Aus dem Jahresbericht 2015: Zahlen und Fakten Zahlen und Fakten Zahlen und Fakten • Figures and Facts Zahlen und Fakten • Figures and Facts Personal: Entwicklung • Staff: development Personelle  
  • 109. VirtMet Whitepaper public EN  
    Date: 18.06.2019
    Percental score: 2 %
    VirtMet Whitepaper public EN PTB Competence Center "Metrology for Virtual Measuring Instruments" (VirtMet) In the course of digitalization, the importance of simulations and in silico experiments  
  • 110. PTB Mitt 2015 Weltraum ENG  
    Date: 23.01.2017
    Percental score: 2 %
    PTB Mitt 2015 Weltraum ENG Special Issue • PTB-Mitteilungen 124 (2014), No. 3 / 4 Metrology with Synchrotron Radiation Radiometric Characterization of Space Instrumentation Alexander Gottwald*,  
###SPINNER###
Search results 101 until 110 of 481
The search query was processed in 346 ms.

Search behavior

In the search, the following parameters can be used:

  • "": Phrase search. The words you entered must occur exactly as entered in the search results. Example: "Metrological Services"
  • -: NOT operation. A word can not appear in the search results. Example: "Metrological Services" -"Verification Act"
  • *: Substring search. Example: "Metrological Services" measure* finds "Metrological Services" measures and "Metrological Services" measurement

If you enter more than one search term, the individual words are connected with an "AND".