Logo of the Physikalisch-Technische Bundesanstalt

Search

Search result

342 results:
41. rng vgl final  
Date: 21.02.2012
Percental score: 8 %
rng vgl final Ringvergleich: Optische Strahlungsleistung 1/5 Abschlussbericht zum Ringvergleich Optische Strahlungsleistung in der optischen Nachrichtentechnik Stefan Kück, AG 4.54,  
42. Accelerator physics: Experiment reveals new options for synchrotron light sources  
Date: 25.02.2021
Percental score: 4 %
Experimental set-up An international team has shown through a sensational experiment how diverse the possibilities for employing synchrotron light sources are. Accelerator experts from the Helmholtz-Zentrum Berlin  
43. Adiabatische Kalorimetrie  
Date: 17.02.2016
Percental score: 4 %
Adiabatische Kalorimetrie Phase transitions of gallium and indium determined by adiabatic calorimetry A. Pramann1, H.-W. Krupke1, Y. Moriya1,2, S. Rudtsch1, and S. M. Sarge1 Introduction Methods  
44. General Conditions of Purchase  
Date: 22.01.2020
Percental score: 2 %
As of 2019-06-13 General Conditions of Purchase General Conditions of Purchase of the Physikalisch-Technische Bundesanstalt (PTB) As of: 13 June 2019 1. General For the contractual relationship  
45. AG112 Publikationen  
Date: 12.05.2016
Percental score: 6 %
AG112 Publikationen Publikationen der Arbeitsgruppe 1.12 – Waagen Publications of the working group 1.12 – weighing instruments Aufnehmer und Sensoren Transducers and sensors Mack, O.: Kumme,  
46. Alanine dosimetry - from metrology to therapy?  
Date: 09.08.2007
Percental score: 5 %
A commercial, compact ESR spectrometer intended for use in industrial alanine dosimetry was investigated with respect to its possible use in radiation therapy dosimetry. If data analysis procedures  
47. All over the world – weighing instruments made in Germany  
Date: 16.11.2009
Percental score: 11 %
Every third weighing instrument worldwide is "Made in Germany". The large market share of Germany's weighing instrument industry reflects the good reputation of its products – they are  
48. Annex 1 Devices of the core facility  
Date: 03.05.2017
Percental score: 8 %
Annex 1 Devices of the core facility Technical equipment a) Magnetic shielding: − In 2004 the actively and passively shielded room BMSR-2 BMSR 2 was put into operation with seven Mu-metal metal  
49. Annex 2 Services of the core facility  
Date: 08.05.2017
Percental score: 4 %
Annex 2 Services of the core facility Services − Magnetic shielding Contact person: Dr. Allard Schnabel Within this core facility centre we offer measurement time in three magnetically shielded  
50. APLMF APMP PTB National Metroligical Infrastructure 01  
Date: 19.01.2018
Percental score: 2 %
APLMF APMP PTB National Metroligical Infrastructure 01 National Metrological Infrastructure JOINT GUIDE 1 APLMF ASIA-PACIFIC LEGAL METROLOGY FORUM First edition Second edition November 2010  
###SPINNER###
Search results 41 until 50 of 342
The search query was processed in 236 ms.

Search behavior

In the search, the following parameters can be used:

  • "": Phrase search. The words you entered must occur exactly as entered in the search results. Example: "Metrological Services"
  • -: NOT operation. A word can not appear in the search results. Example: "Metrological Services" -"Verification Act"
  • *: Substring search. Example: "Metrological Services" measure* finds "Metrological Services" measures and "Metrological Services" measurement

If you enter more than one search term, the individual words are connected with an "AND".