Logo of the Physikalisch-Technische Bundesanstalt

Search

Search result

343 results:
201. Objective  
Date: 22.04.2016
Percental score: 19 %
Objective Dr. Mathias Anton Physikalisch-Technische Bundesanstalt 6.24 Alanin-Dosimetrie Bundesallee 100 38116 Braunschweig mathias.anton@ptb.de (0531) 592-6240  
202. On-Wafer Microwave measurements  
Date: 12.05.2021
Percental score: 3 %
Publications before 2020   R. G. Clarke, X. Shang, N. M. Ridler, R. Lozar, T. Probst and U. Arz: An interlaboratory study of the reproducibility of on-wafer S-parameter measurements from 140  
203. Operation of the ion accelerators by Department 6.4  
Date: 15.01.2007
Percental score: 8 %
The department operates two ion accelerators: a Van-de-Graaff linear accelerator and a compact cyclotron. In the period from October 1, 2005 to September 30, 2006, the two accelerators were used for  
204. Optimisation of the Ion Beam-Apparatus to Maximal Transmission  
Date: 25.06.2007
Percental score: 6 %
At the ion accumulation experiment the mass of accumulated ions and thereby the measurement uncertainty is governed by the value of the ion current at the collector. In order to achieve the maximal  
205. Order form for calibrations  
Date: 28.07.2022
Percental score: 7 %
Order form for calibrations Order form for calibrations or tests of active dosemeters or secondary standards Only active dosemeters and secondary standards will be calibrated which largely meet  
206. Order form for irradiations  
Date: 28.07.2022
Percental score: 7 %
Order form for irradiations Order form for the irradiation of passive dosemeter badges The badges will be irradiated according to the specifications formulated in this order. The customer will obtain  
207. PTB's Organization Chart  
Date: 04.11.2022
Percental score: 4 %
PTB's Organization Chart Organization Chart Physikalisch-Technische Bundesanstalt Presidential Board President Vice-president Member of the Presidential Board Prof. Dr. C. Denz Dr. Prof. h.c. F.  
208. Annex to PTB's Organization Chart  
Date: 04.11.2022
Percental score: 5 %
Annex to PTB's Organization Chart ANNEX to Organization Chart of PTB Internal Structure of the Presidential Staff Office Presidential Staff Office WG PSt2 Central Quality Management Dr. A.  
209. PA01  
Date: 11.08.2009
Percental score: 5 %
Udo Gerlach, Thomas Uehlken: Energieversorgung à la pls, In: P&A März 2007, S.69-71 (www.pua24.net) PA01 FAC H B E I T R AG SICHERHEIT & EX-SCHUTZ 69 Energieversorgung à la pls Leistungssteigerung  
210. PIM measurements on a multiband antenna in the project “5G-Reallabor”  
Date: 08.12.2020
Percental score: 6 %
Dynamic PIM measurement being carried out on a multiband antenna Passive intermodulation (PIM) leads to interference signals in cellular networks and can therefore degrade network quality. In the project “5G-Reallabor”, PTB is working on traceability for PIM  
###SPINNER###
Search results 201 until 210 of 343
The search query was processed in 297 ms.

Search behavior

In the search, the following parameters can be used:

  • "": Phrase search. The words you entered must occur exactly as entered in the search results. Example: "Metrological Services"
  • -: NOT operation. A word can not appear in the search results. Example: "Metrological Services" -"Verification Act"
  • *: Substring search. Example: "Metrological Services" measure* finds "Metrological Services" measures and "Metrological Services" measurement

If you enter more than one search term, the individual words are connected with an "AND".