Logo of the Physikalisch-Technische Bundesanstalt

Search

Search result

366 results:
101. rng vgl final  
Date: 21.02.2012
Percental score: 8 %
rng vgl final Ringvergleich: Optische Strahlungsleistung 1/5 Abschlussbericht zum Ringvergleich Optische Strahlungsleistung in der optischen Nachrichtentechnik Stefan Kück, AG 4.54,  
102. 842 Dynamik Diss Eichstaedt  
Date: 15.03.2012
Percental score: 2 %
842 Dynamik Diss Eichstaedt Analysis of Dynamic Measurements - Evaluation of dynamic measurement uncertainty vorgelegt von Diplom-Mathematiker Sascha Eichstädt Frankenberg/Hainichen Von der  
103. i MERA-Plus final publishable report v1.0  
Date: 20.08.2012
Percental score: 1 %
i MERA-Plus final publishable report v1.0 P PROJ ECT FINA AL RE EPOR RT Grant A Agreementt number: 217257 Projectt acronym: us iMERA-Plu Projectt title: opean Reseearch Area Implementiing the  
104. 2012 Piester Proc PTTI2011  
Date: 24.09.2012
Percental score: 2 %
2012 Piester Proc PTTI2011 Proc. 43rd Annual Time and Time Interval (PTTI) Systems and Applications Meeting, 14-17 Nov 2011, Long Beach, California, USA, pp. 185-196, 2012. TIME AND FREQUENCY  
105. Norman Hackerman Young Author Award for PTB researcher Philipp Hönicke  
Date: 15.10.2012
Percental score: 8 %
The ‘2011 Norman Hackerman Young Author Award’ of the Electrochemical Society (ECS) was given to C. Fleischmann, S. Couet (both KU Leuven, Belgium), P. Hönicke (PTB Berlin) and K. Schouteden (IMEC,  
106. Influence of humidity on precision torque transducer easily measurable  
Date: 24.10.2012
Percental score: 6 %
Precision torque transducers based on strain gauges can, as far as they are not hermetically enclosed, be influenced by the humidity contained in the ambient air. Measuring the humidity coefficient  
107. 2012 Rost Metrologia 49 TTTOF author version  
Date: 08.11.2012
Percental score: 2 %
2012 Rost Metrologia 49 TTTOF author version This is an author-created, un-copyedited version of an article accepted for publication in Metrologia, 49 (2012) 772–778. IOP Publishing Ltd is not  
108. Blind test of the alanine dosimetry system  
Date: 03.12.2012
Percental score: 8 %
To check the reliability of the dosimetry system based on alanine/ESR, a blind test was carried out with the support of the BIPM. At a standard uncertainty of approx. 0.4 %, the doses determined are  
109. 2012 Bauch PTBM 125a en  
Date: 11.02.2013
Percental score: 2 %
2012 Bauch PTBM 125a en Time – the SI Base Unit “Second” n Special Issue / PTB-Mitteilungen 122 (2012), No. 1 Time – the SI Base Unit “Second” Andreas Bauch* Structure 1 Introduction 2 The  
110. Near-field microscopy with synchrotron radiation successful  
Date: 30.04.2013
Percental score: 8 %
At PTB’s electron storage ring Metrology Light Source (MLS), a scattering type near-field microscope for the infrared (IR) regime has been successfully put into operation in cooperation with the  
###SPINNER###
Search results 101 until 110 of 366
The search query was processed in 224 ms.

Search behavior

In the search, the following parameters can be used:

  • "": Phrase search. The words you entered must occur exactly as entered in the search results. Example: "Metrological Services"
  • -: NOT operation. A word can not appear in the search results. Example: "Metrological Services" -"Verification Act"
  • *: Substring search. Example: "Metrological Services" measure* finds "Metrological Services" measures and "Metrological Services" measurement

If you enter more than one search term, the individual words are connected with an "AND".