Logo of the Physikalisch-Technische Bundesanstalt

Search

Search result

370 results:
  • 101. Publications of the Working Group 6.42  
    Date: 15.04.2016
    Percental score: 3 %
    back B. v. Krosigk, M. Chen, S. Hans, A. R. Junghans, T. Kögler, C. Kraus, L. Kuckert, X. Liu, R. Nolte, H. M. O’Keeffe,  
  • 102. Publications  
    Date: 30.03.2016
    Percental score: 3 %
    Publications 2006-2007 Bodermann, Bernd ; Buhr, Egbert ; Diener, Alexander ; Dirscherl, Kai ; Ehret, Gerd ; Frase, Carl Georg ; Wurm, Matthias: Aspects and new developments on edge angle and edge  
  • 103. PTB Mitt 2015 Reflektometrie ENG  
    Date: 23.01.2017
    Percental score: 3 %
    PTB Mitt 2015 Reflektometrie ENG Special Issue • PTB-Mitteilungen 124 (2014), No. 3 / 4 Reflectometry with Synchrotron Radiation Reflectometry with Synchrotron Radiation Michael Krumrey*, Levent  
  • 104. On-Wafer Microwave measurements  
    Date: 12.05.2021
    Percental score: 3 %
    Publications before 2020   R. G. Clarke, X. Shang, N. M. Ridler, R. Lozar, T. Probst and U. Arz: An interlaboratory study of the reproducibility of on-wafer S-parameter measurements from 140  
  • 105. QMH KAP 36 A11  
    Date: 26.02.2021
    Percental score: 3 %
    QMH KAP 36 A11 Qualitätsmanagement-Handbuch Konformitätsbewertungsstelle 3.6 Leistungsangebot Sektor 4: National geregelte Messgeräte Die den Produktzertifizierungen zugrundeliegenden Prüfungen  
  • 106. Figures and Facts 2013  
    Date: 26.03.2014
    Percental score: 3 %
    Aktuelle Statistiken 2013 Zahlen und Fakten Zahlen und Fakten • Figures and Facts Zahlen und Fakten • Figures and Facts Personal: Entwicklung • Staff: development Personelle Entwicklung von 2004 bis  
  • 107. Lateral1d analysis using sine sigmoid  
    Date: 14.08.2023
    Percental score: 3 %
    Lateral1d analysis using sine sigmoid Auswertung der RS-N und RS-M Normale Dorothee Hüser, FG 5.10 30. Mai 2022 1/25 Ablauf Voraussetzung: Die Stege (Linienstrukturen) des Gitters liegen  
  • 108. Projects  
    Date: 29.04.2016
    Percental score: 3 %
    TRAINSTIM - Neuronal basis of active aging Period: 7/2015 - 12/2018 Funding:    BMBF Partners: Charité - Universitätsmedizin Berlin, TU Dresden Contact: 8.12, Bernd Ittermann  
  • 109. checklist  
    Date: 30.09.2009
    Percental score: 3 %
    checklist Checklist for electromechanical and electronic active energy meters in accordance with the MID Directive (2004/22/EC) Applicant: Instrument type: 1. General requirements NOTE: Definitions  
  • 110. Information Sheet on Testing the Software of Sound Level Meters v20220517EN  
    Date: 06.07.2022
    Percental score: 3 %
    Information Sheet on Testing the Software of Sound Level Meters v20220517EN Physikalisch-Technische Bundesanstalt (PTB) Working Group 1.63 (Noise Measuring Technology) Information Sheet, Software  
###SPINNER###
Search results 101 until 110 of 370
The search query was processed in 332 ms.

Search behavior

In the search, the following parameters can be used:

  • "": Phrase search. The words you entered must occur exactly as entered in the search results. Example: "Metrological Services"
  • -: NOT operation. A word can not appear in the search results. Example: "Metrological Services" -"Verification Act"
  • *: Substring search. Example: "Metrological Services" measure* finds "Metrological Services" measures and "Metrological Services" measurement

If you enter more than one search term, the individual words are connected with an "AND".