Logo of the Physikalisch-Technische Bundesanstalt

Search

Search result

341 results:
101. i MERA-Plus final publishable report v1.0  
Date: 20.08.2012
i MERA-Plus final publishable report v1.0 P PROJ ECT FINA AL RE EPOR RT Grant A Agreementt number: 217257 Projectt acronym: us iMERA-Plu Projectt title: opean Reseearch Area Implementiing the  
102. 2012 Piester Proc PTTI2011  
Date: 24.09.2012
Percental score: 1 %
2012 Piester Proc PTTI2011 Proc. 43rd Annual Time and Time Interval (PTTI) Systems and Applications Meeting, 14-17 Nov 2011, Long Beach, California, USA, pp. 185-196, 2012. TIME AND FREQUENCY  
103. New facility for the combined generation of force and torque  
Date: 05.10.2012
Percental score: 11 %
After a complex planning phase, the implementation of a machine allowing both longitudinal force and torque to be generated simultaneously is entering into its final phase. The measurement facility  
104. Norman Hackerman Young Author Award for PTB researcher Philipp Hönicke  
Date: 15.10.2012
Percental score: 7 %
The ‘2011 Norman Hackerman Young Author Award’ of the Electrochemical Society (ECS) was given to C. Fleischmann, S. Couet (both KU Leuven, Belgium), P. Hönicke (PTB Berlin) and K. Schouteden (IMEC,  
105. Influence of humidity on precision torque transducer easily measurable  
Date: 24.10.2012
Percental score: 5 %
Precision torque transducers based on strain gauges can, as far as they are not hermetically enclosed, be influenced by the humidity contained in the ambient air. Measuring the humidity coefficient  
106. 2012 Rost Metrologia 49 TTTOF author version  
Date: 08.11.2012
Percental score: 2 %
2012 Rost Metrologia 49 TTTOF author version This is an author-created, un-copyedited version of an article accepted for publication in Metrologia, 49 (2012) 772–778. IOP Publishing Ltd is not  
107. Blind test of the alanine dosimetry system  
Date: 03.12.2012
Percental score: 7 %
To check the reliability of the dosimetry system based on alanine/ESR, a blind test was carried out with the support of the BIPM. At a standard uncertainty of approx. 0.4 %, the doses determined are  
108. 2012 Bauch PTBM 125a en  
Date: 11.02.2013
Percental score: 3 %
2012 Bauch PTBM 125a en Time – the SI Base Unit “Second” n Special Issue / PTB-Mitteilungen 122 (2012), No. 1 Time – the SI Base Unit “Second” Andreas Bauch* Structure 1 Introduction 2 The  
109. Thiel and Seifert JAP 2009  
Date: 04.03.2013
Percental score: 3 %
Thiel and Seifert JAP 2009 Noninvasive probing of the human body with electromagnetic pulses: Modeling of the signal path F. Thiel and F. Seifert Citation: J. Appl. Phys. 105, 044904 (2009); doi:  
110. Near-field microscopy with synchrotron radiation successful  
Date: 30.04.2013
Percental score: 6 %
At PTB’s electron storage ring Metrology Light Source (MLS), a scattering type near-field microscope for the infrared (IR) regime has been successfully put into operation in cooperation with the  
###SPINNER###
Search results 101 until 110 of 341
The search query was processed in 291 ms.

Search behavior

In the search, the following parameters can be used:

  • "": Phrase search. The words you entered must occur exactly as entered in the search results. Example: "Metrological Services"
  • -: NOT operation. A word can not appear in the search results. Example: "Metrological Services" -"Verification Act"
  • *: Substring search. Example: "Metrological Services" measure* finds "Metrological Services" measures and "Metrological Services" measurement

If you enter more than one search term, the individual words are connected with an "AND".