Logo of the Physikalisch-Technische Bundesanstalt

Search

Search result

448 results:
  • 91. UWB EKG 2009  
    Date: 03.12.2010
    Percental score: 1 %
    UWB EKG 2009 REVIEW OF SCIENTIFIC INSTRUMENTS 80, 114302 共2009兲 Non-contact detection of myocardium’s mechanical activity by ultrawideband RF-radar and interpretation applying electrocardiography F.  
  • 92. 2011 01 Rapport BIPM  
    Date: 10.01.2011
    Percental score: 2 %
    2011 01 Rapport BIPM Rapport BIPM-2011/01 BUREAU INTERNATIONAL DES POIDS ET MESURES Directive for operational use and data handling in two-way satellite time and frequency transfer  
  • 93. 2009 PTBM 119,3 50a DCF77 engl  
    Date: 18.01.2011
    Percental score: 2 %
    ... in... in...  
  • 94. Evaluation Report 2008 (Wissenschaftsrat)  
    Date: 25.01.2011
    Percental score: 1 %
    The German Federal Government, after it had passed extensive recommendations and thirteen individual evaluations of federal institutions undertaking R&D (research and development) work, in June 2006  
  • 95. 2006 Bauch - Metrologia43 author version Comparison  
    Date: 21.02.2011
    Percental score: 2 %
    2006 Bauch - Metrologia43 author version Comparison Comparison between frequency standards in Europe and the USA at the 10-15 uncertainty level A. Bauch(1), J. Achkar(2), S. Bize(2), D. Calonico(3),  
  • 96. 2005 BAUCH CS12 Metrologia author version  
    Date: 22.02.2011
    Percental score: 1 %
    2005 BAUCH CS12 Metrologia author version The PTB primary clocks CS1 and CS2 Andreas Bauch Physikalisch-Technische Bundesanstalt, Braunschweig, Germany Abstract The primary clocks CS1 and CS2 have  
  • 97. ra45 98 03-en  
    Date: 07.03.2011
    Percental score: 2 %
    ra45 98 03-en Physikalisch-Technische Bundesanstalt Radioaktivität PTB-Ra-45 Braunschweig, November 2005 Herbert Wershofen and Dirk Arnold Radionuclides in Ground-level Air in Braunschweig  
  • 98. kcs07 en  
    Date: 08.03.2011
    Percental score: 7 %
    kcs07 en K-40 and Cs-137 in ground-level air in Braunschweig 2007 1,0 New Year's Eve firework (KClO4) New Year's Eve firework (KClO4) week 31: much dust, (highway reconstruction site at ca. 1 km  
  • 99. kcs08 en  
    Date: 08.03.2011
    Percental score: 8 %
    kcs08 en K-40 and Cs-137 in ground-level air in Braunschweig 2008 60 1,0 New Year's Eve firework (KClO4) weeks 30 - 33: resuspension / grain harvest week 17, 19 - 24: pollen, much soil dust, dry  
  • 100. kcs09 en  
    Date: 08.03.2011
    Percental score: 9 %
    kcs09 en K-40 and Cs-137 in ground-level air in Braunschweig 2009 1,0 60 New Year's Eve firework (KClO4) week 14 - 24: much pollen week 26: begin grain harvest week 43: dry, wind from  
###SPINNER###
Search results 91 until 100 of 448
The search query was processed in 256 ms.

Search behavior

In the search, the following parameters can be used:

  • "": Phrase search. The words you entered must occur exactly as entered in the search results. Example: "Metrological Services"
  • -: NOT operation. A word can not appear in the search results. Example: "Metrological Services" -"Verification Act"
  • *: Substring search. Example: "Metrological Services" measure* finds "Metrological Services" measures and "Metrological Services" measurement

If you enter more than one search term, the individual words are connected with an "AND".