zum Seiteninhalt

Physikalisch-Technische Bundesanstalt

StructureDiv. 7 Temperature and Synchrotron Radiation7.1 Radiometry with Synchrotron Radiation > 7.15 Instrumentation Berlin-Adlershof
Instrumentation Berlin-Adlershof
Working Group 7.15



Tasks

The instrumentation group in Berlin-Adlershof is responsible for design, construction and commisioning of beamlines and experimental setups and the scientific infrastructure at both locations, the PTB laboratory at BESSY II and the Willy Wien Laboratory.




Contact

Address
Physikalisch-Technische Bundesanstalt
Working Group 7.15
Abbestr. 2-12
10587 Berlin
Germany


© Physikalisch-Technische Bundesanstalt, last update: 2012-01-05,  Seite drucken PrintviewPDF-Export PDF